The buying shortcut

Distribution, visibility, and control are different jobs.

A PDU’s outlet count does not tell you whether it measures load, reports it over a network, or lets you switch individual outlets. Check those capabilities explicitly.

Compare the management tiers

CategoryTypical purposeVerify separately
BasicDistribute input power to multiple outputsElectrical rating, connectors and protection
Local meteredShow load information on the unitWhich quantities are measured; no assumed networking
Network monitoredReport measurements remotelyProtocols, security, sensors, and measurement granularity
SwitchedControl outlets or outlet groupsControl granularity and whether metering is included

Terminology varies between manufacturers. Treat category names as a starting point and read the exact product’s capabilities. A switched product does not automatically have per-outlet power measurement.

Compare three exact 120 V models: PDUMH15, PDUMNH15, and PDUMH15NET2LX →

The PDUMH15 example

Eaton’s PDUMH15 provides a local current meter, thirteen 5-15R outlets and a 12 A continuous rating at 120 V. It is not a remote power-cycling solution and does not contain battery backup. If either is required, change the product category.

Read the PDUMH15 research review →

What to write in your buying checklist

  • Supply voltage, input connector and cord reach.
  • Continuous rating for the exact regional model.
  • Output connector types, count and physical arrangement.
  • Mounting orientation, rack space and service clearance.
  • Required measurements, remote protocols and switching granularity.
  • Manufacturer-approved use with the intended UPS or supply.
A PDU is not battery backup.Distribution equipment does not bridge an outage without an appropriate energy source. Installation and supply requirements remain model- and site-specific.

Primary reference

Eaton PDUMH15 product specifications and documentation, checked 15 October 2026.